Main Menu

Section of Ridge Road in Largo Remains Closed

Road Closed | Road Constuction Traffic

Repairs are continuing along Ridge Road.

LARGO – The section of Ridge Road from Valencia Drive to 14th Avenue SW, just north of Ulmerton Road, will remain closed to through traffic at least until July 28 to allow crews to complete road repairs stemming from underground sanitary sewer pipe construction. Local traffic is being detoured between Valencie Drive and 16th Avenue SW to allow residents access. Trucks are not allowed on the detour and must use Seminole Boulevard. Drivers are cautioned to observe the road closure signs, proceed with caution and use alternative routes.

For information about Largo’s sanitary sewer project, see largo.com. For information about the road closure, call Largo’s engineering services division at (727) 587-6713 or see largo.com for a map of the area.

Largo | Ridge Road | Road Closure | Largo Sewer Project | Road Construction

#Largo #RidgeRoad #RoadClosure #LargoSewerProject #RoadConstruction #TBReporter