Main Menu

Clearwater Streets Set for Facelift

Road Repair | Road Construction | Road Work

Expect traffic slowdowns with upcoming street resurfacing projects.

CLEARWATER – This city’s annual street resurfacing contract was recently signed and milling and repaving will begin this month (April) and is expected to continue through July.

Streets currently scheduled for resurfacing include: Enterprise Drive (Countryside Boulevard to McMullen Booth Road); Village Drive (Countryside Boulevard to Village Drive); Landmark Drive (south of State Route 580 to Lake Chautauqua); and, Northside Drive (from U.S. 19 to Countryside Boulevard). Additional areas may be added as needed, and construction on current streets may be altered contingent on field conditions.

Notices will be distributed to affected neighborhoods 48 hours in advance of street resurfacing. The majority of construction will take place between 7 a.m. through 6 p.m. Monday through Saturday. Work may take place in the evenings or on Sundays depending on schedule and/or field conditions.

Residents with questions can call the city’s Engineering Department at (727) 562-4750.

For information about the city of Clearwater, go to myclearwater.com.

Clearwater | Road Work | Traffic | Road Paving | Tampa Bay News | TB Reporter

#Clearwater #RoadWork #Traffic #RoadPaving #TampaBayNews #TBReporter